Resources

Documents available Thursday, October 30, 2025

Bid Document Request Forms may now be emailed to biddoc@bsu.edu

Scope of Work

Replacement of an existing 4-pipe air handling unit serving the Elevator Machine Room with a new split-system electric heat-pump air handler, HVAC controls, and electrical alterations.Controls include compatible connection to the existing building management system.Electrical alterations include Elevator Code compliance improvements for electrical power, new emergency power circuits from the existing emergency power system, separation of power to dedicated circuits, lighting, and fire alarm systems modifications.

ESTIMATED COST OF CONSTRUCTION: $300,000.00

ANTICIPATED START DATE: December 15, 2025
SUBSTANTIAL COMPLETION DATE:  May 11, 2026

Related Documents

Notice to Bidder

Plan Holder List

Addendum No 1 - 11/13/25

Addendum No 2 - 11/18/25

Addendum No 3 - 12/1/25

     

Documents are available and may be obtained by faxing or emailing the Bid Document Request Form (PDF) to Purchasing Services 765-285-1756 or biddoc@bsu.eduThe online documents require Adobe Reader. If you are having trouble viewing documents, try using a different browser, such as Firefox or Chrome.